Our projects

Esper Club
address: Эсперова, д16/23, Санкт-Петербург, Россия.
performed work: комплекс работ по устройству отделки входной группы, помещений МОП и лестничных клеток
project budget: rub 98 000 000
In 2020-2021 ZAO “JGB Group LTD.” Participated in the implementation of a new Project of a Club House, Esper Club at Krestovskiy Island with “Yevrostroirazvitiye” Company as the Client for the Project. In cooperation with the Client’s representatives. Our company elaborated design and issued the Project Documentation for the Main Lobby and public zones of the building, including engineering network. The interiors of the Club House were designed in the style of Arte Nouveau, as a combination of the wooden panels as finishing elements to walls, natural stone on floors, forged elements, leaded pane glazing in favrile technique of L.C.Tiffany, as well as casting plaster. Our company took advantage of all their skills to create unique interiors, embracing modern material and technologies, meanwhile managing to remain in the budget frames.
Grand Hotel Europe
project budget: $ 150 000
Business Centre JGB 1
address: Divenskaya st., 3, St. Petersburg
performed work: full range of works
project budget: $ 1 500 000
Done a full range of works for the reconstruction of the existing building, including development of full package of project documentation, all endorsements and putting building into operation. After putting the business centre into operation the company managed the Busines Centre. JGB Group acted as General Contractor and Manager of the project.
Business Centre JGB 2
address: Serpukhovskaya st., 10, St. Petersburg
performed work: full range of works
project budget: $ 3 500 000
Done a full range of works for the reconstruction of the existing building, which was a monument of architecture, including development of full package of project documentation, all endorsements and putting building into operation. Complex of works included partial change of load bearings, full reconstruction of the façade and premises. After putting the business centre into operation the company managed the Business Centre. JGB Group acted as General Contractor and Manager of the project.
Business Centre JGB 3
address: Zhukovskogo st., 63, St. Petersburg
performed work: full range of works
project budget: $ 8 000 000
Done a full range of works for the reconstruction of the existing building, which was a monument of architecture, including development of full package of project documentation, all endorsements and putting building into operation. Complex of works included partial change of load bearings, full reconstruction of the façade and premises. After putting the business centre into operation the company managed the Business Centre. JGB Group acted as General Contractor and Manager of the project.
Rocco Forte Hotels. Hotel complex Astoria
address: Bolshaya Morskaya St., 39, St. Petersburg, Russia
performed work: full range of works
project budget: $ 14 000 000
It is one of the most complicated and creative project which was done by JGB. There were done whole reconstruction of hotel rooms and common facilities. The whole set of works was done in accordance with requirements to the reconstruction of the federal historic monument. It is important that during the reconstruction all designers’ decisions from British designers were adopted and done in accordance with the requirements of the Russian legislature. All works were done without closing the hotel, which required the most thorough logistics and work organization. Furniture fund was done with the help of Russian producers in accordance with samples provided from Great Britain. JGB Group performed as General Contractor and Project Manager.
Rocco Forte Hotels. Hotel complex Angleterre
address:Bolshaya Morskaya St., 39, St. Petersburg, Russia
performed work: full range of works
project budget: $ 8 000 000
There were done whole reconstruction of hotel rooms and common facilities as well as the change of engineering constructions of the building. All works were done without closing the hotel, which required the most thorough logistics and work organization. Furniture fund was done with the help of Russian producers in accordance with samples provided from Great Britain. JGB Group performed as General Contractor and Project Manager.
Corintia Hotels International, Hotel Corintia Nevsky Palace
address: Nevsky Pr., 57, St. Petersburg, Russia
performed work: refurbishment
project budget: $ 3 000 000
There were done refurbishment of all hotel rooms with partitial repair and change of the furniture. JGB Group performed as General Contractor and Project Manager
Sokotel, Hotel Olympic Garden
address: Bataysky Lane, 3A, St. Petersburg, Russia
performed work: full range of works
project budget: $ 45 000 000
One of the biggest projects done by JGB. The project was done starting from the choosing of the plot and finishing with preparing of the hotel for the clients. In this project JGB performed as a technical Client and General Contractor. The works were done in close cooperation with the Investor and Hotel Operator. Building was done from prefabricated reinforce concrete, which helped considerably to reduce the terms of construction. At the construction was used the experience of Russian and foreign specialists. Also the company was doing the whole legal control of the construction, preparing and carrying out of public hearings, taking part in the development of the district together with St. Petersburg Administration. The project get high remark from the Government and the Governor of St. Petersburg.
Sokotel. Sokos Hotel Vasiljevsky
address: St. Basils Island, 8th line, 11-13. St. Petersburg, Russia
performed work: refurbishing
project budget: $ 5 000 000
JGB Group was a contractor for the production of furniture for the hotel rooms and general premises of the hotel. Also were done some works for the refurbishing of some premises and a complex of works for electric installation.
Sokotel. Holiday Club
address: St. Basils Island, Birzhevoy Lane, 2-4, St. Petersburg, Russia
performed work: refurbishing
project budget: $ 80 000
Quite small project for production and installation of furniture in SPA hotel.
Russian Federation Broadcasting Company
address: Nab. Karpovka riv. 39, St.Petresburg, Russia
performed work: Full set of works
project budget: $ 7 000 000
Full set of works of reconstruction of the existing building including erection of two additional floors and production of full package of project documentation, acquiring all necessary approvals and putto-operation JGB performed as General Constructor and Project Manager. A complex of works were also performed in technological arrangements for installation of TV and radiobroadcasting equipment, as well as arrangement of a special archive storage for cinema and video stock and equipment.
Appartment Complex “The Priviledge”
address: 8, letter A, Viazovaya str., St.Petersburg, Russia.
Works: project, decoration works, utility network, supply of material
Project budget: 750 000 000 rubles
ZAO “JGB Group LTD” participated in implementation of an elite project of one of the leading developers in St.Petersburg, the JSC “Yevrostroi Development” as Designer, Supplier of materials from the world-famous production sites, Conractor in finishing and construction works at the construction of Apartment Complex “The Priviledge” at Krestovskiy Island. ZAO “JGB Group LTD” fulfilled works in the restaurant, fitness center, shops, main entrance hall, as well as in the parking and elevator halls, main stairways and porches at the AP “The Priviledge”.
A complex of low-rize apartment blocks with an administration & amenity block.
address: : plot 6, Vologdina str., Pargolovo, St. Petersburg.
Works: geotechnical investigations, Project works
Total area:47 000 sq.m
Project budget : 2 500 000 000 rubles
Participating in the Project office under the supervision of the vice-governor of St. Petersburg in accordance with the appointment of the President of RF regarding the elaboration of a complex of measures for development of timber housing construction in the Russian Federation, a successful work has been accomplished in the frames of a priority Project of St. Petersburg “Development of low-rize apartment blocks’ construction (renovation) in St. Petersburg for implementation of target programs and other federal needs”, including the following: - the whole complex of geotechnical survey on the total area of 5 hectar of land is fulfilled; - the issue of the ways of implementation of the priority project in compliance with the existing legislation has been explored with reference to the absence of construction norms for designing of timber apartment blocks; - in cooperation with the Committee of Energy and Engineering Provision preliminary evaluation of the action measures’ list was elaborated with reference to the connection of the entity to the engineering network to optimize actions to minimize cost of expenses for the connections; - projects for utilities’ network relocation out of the plot are accomplished and approved by the owners of the networks; - preproject works are carried out which resulted in coordination of architectonic design of the entity by the Urban Committee; - the Project for low-rize apartment blocks’ construction is fulfilled and handed over to the Federal Expertize.
AZIMUT Hotels, St.Petersburg.
address: : - , St. Petersburg.
Works: -
Total area:- sq.m
Project budget : - rubles
Since October 2018 ZAO “JGB Group LTD” has been carrying out refurbishment works in 84 rooms on floors 16 and 17 of the Hotel “Sovetskaya”, “AZIMUT Hotels, St.Petersburg”: 68 standard rooms, 8 family rooms and 8 suites. The works on replacement of tiling on walls and floors as well as cosmetic repair of walls and ceiling are due to be accomplished end of March 2019
Multifunctional office & hotel complex with a spa center and apartment hotel
address: : 87M, Sredniy pr., Vasilievskiy Island, St.Petersburg
Works: -
Total area:- sq.m
Project budget : - rubles
Successful cooperation between ZAO “JGB Group LTD” and OOO “Eurostroi Development” at the “Priviledge” project found continuation in a new project – “Multifunctional office & hotel complex with a spa center and apartment hotel” in 87M, Sredniy pr., Vasilievskiy Island, St.Petersburg. ZAO “JGB Group LTD” were invited again by the Client to perform finishing works at the new-erected building.